Testing and Commissioning
Verifying Every System Before Going Live Before energization, the complete solar system undergoes systematic inspection, testing and commissioning.
Key Activities:
- Visual inspection of the complete installation.
- Verification of module strings and polarity.
- DC voltage and current checks.
- Insulation resistance testing.
- Continuity and earthing checks.
- AC-side electrical testing.
- Inverter functional testing.
- Protection system verification.
- Metering verification.
- Monitoring system testing.
- Synchronization with the grid, wherever applicable.
- Performance verification under operating conditions.
- Rectification of identified defects or deviations.
Deliverable:
Commissioning Report confirming that the system is safe, operational and ready for regular generation.